Related Posts with Thumbnails

03 March, 2009

Sg Mudong Bridge Project (PIAS) Site Handing Over on 3.3.2009

(From left: Contractor, Contractor, DE Saratok, En Jugah, En. Marshall and SAO Roban En. Suhandi)

Photo taken at the bridge site

0 comments: